China Aluminized Steel Tubing Factories - ERW Steel Pipe – TOPTAC

Short Description:

Products Name:ERW Steel Pipes: Standard:ASTM A53, ASTM A500,BS1387,BS EN10219,EN10217 GB/T3091-2001 Material:Q195,Q235,Q345,GRA GRB,S235JRH,S275JOH,S355JOH ETC, Outdiameter:6mm-406.4mm(1/8”to 16”) Sizes of  Steel pipes                         Outer Diameter Wall Thickness Length Inch mm mm meter 1/8” 10.3mm 0.4-2.0mm 0.3m-12m 1/4” 13.7mm 0.4-2.0mm 0.3m-12m 3/8” 17.1mm 0.4-2.0mm 0.3m-12m 1/2″ 21.3mm 0.6mm-3.0mm 0.3m-12m 3/4″ 26.9mm 0.6mm-3.0mm 0.3m-12m 1″ 33.4mm 1.0mm-3.0mm 0....


Product Detail

Product Tags

Related Video

Feedback (2)

Every single member from our higher effectiveness product sales staff values customers' requires and organization communication for Square Pipe, Pre Galvanized Hollow Section Tube, Shs Box Section, In addition, we would properly guide the customers about the application techniques to adopt our products and the way to select appropriate materials.
China Aluminized Steel Tubing Factories - ERW Steel Pipe – TOPTAC Detail:

Products Name:ERW Steel Pipes:

Standard:ASTM A53, ASTM A500,BS1387,BS EN10219,EN10217 GB/T3091-2001

Material:Q195,Q235,Q345,GRA GRB,S235JRH,S275JOH,S355JOH ETC,

Outdiameter:6mm-406.4mm(1/8”to 16”)

Sizes of  Steel pipes                        

Outer Diameter Wall Thickness Length
Inch mm mm meter
1/8” 10.3mm 0.4-2.0mm 0.3m-12m
1/4” 13.7mm 0.4-2.0mm 0.3m-12m
3/8” 17.1mm 0.4-2.0mm 0.3m-12m
1/2″ 21.3mm 0.6mm-3.0mm 0.3m-12m
3/4″ 26.9mm 0.6mm-3.0mm 0.3m-12m
1″ 33.4mm 1.0mm-3.0mm 0.3m-12m
1-1/4″ 42.3mm 1.0mm-4.0mm 0.3m-12m
1-1/2″ 48.3mm 1.0mm-4.0mm 0.3m-12m
2″ 60.3mm 1.5mm-4.0mm 0.3m-12m
2-1/2″ 76.1mm 1.5mm-4.0mm 0.3m-12m
3″ 88.9mm 1.5mm-9.5mm 0.3m-12m
4″ 114.3mm 2.0mm-9.5mm 0.3m-12m
5″ 141.3mm 3.0mm-9.5mm 0.3m-12m
6″ 168.3mm 3.0mm-12.0mm 1.0m-12m
8″ 219.1mm 3.2mm-12.0mm 1.0m-12m
10″ 273mm 3.2mm-12.0mm 1.0m-12m
12″ 323.8mm 6.0mm-15.0mm 1.0m-12m
14″ 355.6mm 8.0mm-15.0mm 1.0m-12m
16″ 406.4mm 8.0mm-20.0mm 1.0m-12m

Ends:Beveled ends,plain ends,threaded

Surface:mill finish,galvanized,painted,powder coated

Package: Packing by plastic bags,bundled by steel strip,or as your demand

Delivery Time: 1.The products in stock will delivery immediately received the deposit

2.According to the order quantity, the delivery time range from five days to twenty  days.

Trade Terms:

1.Price Term:EX-Work,FOB,CFR,CIF,

2.Payment Term:T/T or L/C

<!–

Download as PDF

–>


Product detail pictures:

China Aluminized Steel Tubing Factories - ERW Steel Pipe – TOPTAC detail pictures

China Aluminized Steel Tubing Factories - ERW Steel Pipe – TOPTAC detail pictures

China Aluminized Steel Tubing Factories - ERW Steel Pipe – TOPTAC detail pictures

China Aluminized Steel Tubing Factories - ERW Steel Pipe – TOPTAC detail pictures

China Aluminized Steel Tubing Factories - ERW Steel Pipe – TOPTAC detail pictures


Related Product Guide:
Cooperation

We have a professional, efficiency team to provide quality service for our customer. We always follow the tenet of customer-oriented, details-focused for China Aluminized Steel Tubing Factories - ERW Steel Pipe – TOPTAC , The product will supply to all over the world, such as: San Diego, Malta, San Diego, Our company abides by the management idea of "keep innovation, pursue excellence". On the basis of assuring the advantages of existing merchandise, we continuously strengthen and extend product development. Our company insists on innovation to promote the sustainable development of enterprise, and make us become the domestic high-quality suppliers.
  • Product variety is complete, good quality and inexpensive, the delivery is fast and transport is security, very good, we are happy to cooperate with a reputable company!
    5 Stars By Adelaide from Colombia - 2018.02.12 14:52
    Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!
    5 Stars By Monica from South Africa - 2017.09.29 11:19
    Write your message here and send it to us