China Steel Drainage Pipe Factory - ERW Steel Pipe – TOPTAC

Short Description:

Products Name:ERW Steel Pipes: Standard:ASTM A53, ASTM A500,BS1387,BS EN10219,EN10217 GB/T3091-2001 Material:Q195,Q235,Q345,GRA GRB,S235JRH,S275JOH,S355JOH ETC, Outdiameter:6mm-406.4mm(1/8”to 16”) Sizes of  Steel pipes                         Outer Diameter Wall Thickness Length Inch mm mm meter 1/8” 10.3mm 0.4-2.0mm 0.3m-12m 1/4” 13.7mm 0.4-2.0mm 0.3m-12m 3/8” 17.1mm 0.4-2.0mm 0.3m-12m 1/2″ 21.3mm 0.6mm-3.0mm 0.3m-12m 3/4″ 26.9mm 0.6mm-3.0mm 0.3m-12m 1″ 33.4mm 1.0mm-3.0mm 0....


Product Detail

Product Tags

Related Video

Feedback (2)

"Based on domestic market and expand overseas business" is our development strategy for Box Section Stainless Steel, Bs 1387, Painted Steel Coil, All products come with good quality and perfect after-sales services. Market-oriented and customer-oriented are what we have been being after. Sincerely look forward to Win-Win cooperation !
China Steel Drainage Pipe Factory - ERW Steel Pipe – TOPTAC Detail:

Products Name:ERW Steel Pipes:

Standard:ASTM A53, ASTM A500,BS1387,BS EN10219,EN10217 GB/T3091-2001

Material:Q195,Q235,Q345,GRA GRB,S235JRH,S275JOH,S355JOH ETC,

Outdiameter:6mm-406.4mm(1/8”to 16”)

Sizes of  Steel pipes                        

Outer Diameter Wall Thickness Length
Inch mm mm meter
1/8” 10.3mm 0.4-2.0mm 0.3m-12m
1/4” 13.7mm 0.4-2.0mm 0.3m-12m
3/8” 17.1mm 0.4-2.0mm 0.3m-12m
1/2″ 21.3mm 0.6mm-3.0mm 0.3m-12m
3/4″ 26.9mm 0.6mm-3.0mm 0.3m-12m
1″ 33.4mm 1.0mm-3.0mm 0.3m-12m
1-1/4″ 42.3mm 1.0mm-4.0mm 0.3m-12m
1-1/2″ 48.3mm 1.0mm-4.0mm 0.3m-12m
2″ 60.3mm 1.5mm-4.0mm 0.3m-12m
2-1/2″ 76.1mm 1.5mm-4.0mm 0.3m-12m
3″ 88.9mm 1.5mm-9.5mm 0.3m-12m
4″ 114.3mm 2.0mm-9.5mm 0.3m-12m
5″ 141.3mm 3.0mm-9.5mm 0.3m-12m
6″ 168.3mm 3.0mm-12.0mm 1.0m-12m
8″ 219.1mm 3.2mm-12.0mm 1.0m-12m
10″ 273mm 3.2mm-12.0mm 1.0m-12m
12″ 323.8mm 6.0mm-15.0mm 1.0m-12m
14″ 355.6mm 8.0mm-15.0mm 1.0m-12m
16″ 406.4mm 8.0mm-20.0mm 1.0m-12m

Ends:Beveled ends,plain ends,threaded

Surface:mill finish,galvanized,painted,powder coated

Package: Packing by plastic bags,bundled by steel strip,or as your demand

Delivery Time: 1.The products in stock will delivery immediately received the deposit

2.According to the order quantity, the delivery time range from five days to twenty  days.

Trade Terms:

1.Price Term:EX-Work,FOB,CFR,CIF,

2.Payment Term:T/T or L/C

<!–

Download as PDF

–>


Product detail pictures:

China Steel Drainage Pipe Factory - ERW Steel Pipe – TOPTAC detail pictures

China Steel Drainage Pipe Factory - ERW Steel Pipe – TOPTAC detail pictures

China Steel Drainage Pipe Factory - ERW Steel Pipe – TOPTAC detail pictures

China Steel Drainage Pipe Factory - ERW Steel Pipe – TOPTAC detail pictures

China Steel Drainage Pipe Factory - ERW Steel Pipe – TOPTAC detail pictures


Related Product Guide:
Cooperation

We've been proud with the significant shopper fulfillment and wide acceptance due to our persistent pursuit of top of the range both of those on solution and repair for China Steel Drainage Pipe Factory - ERW Steel Pipe – TOPTAC , The product will supply to all over the world, such as: Las Vegas, Portugal, Afghanistan, We've been consistently broadening the market within Romania in addition to preparation punching in extra premium quality merchandise connected with printer on t shirt so that you can Romania. Most people firmly believe we've the whole capacity to provide you happy solutions.
  • Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Jean Ascher from Georgia - 2018.06.28 19:27
    The product manager is a very hot and professional person, we have a pleasant conversation, and finally we reached a consensus agreement.
    5 Stars By Fernando from Afghanistan - 2017.09.16 13:44
    Write your message here and send it to us