Wholesale Hot Rolled Steel Tube Factory - ERW Steel Pipe – TOPTAC

Short Description:

Products Name:ERW Steel Pipes: Standard:ASTM A53, ASTM A500,BS1387,BS EN10219,EN10217 GB/T3091-2001 Material:Q195,Q235,Q345,GRA GRB,S235JRH,S275JOH,S355JOH ETC, Outdiameter:6mm-406.4mm(1/8”to 16”) Sizes of  Steel pipes                         Outer Diameter Wall Thickness Length Inch mm mm meter 1/8” 10.3mm 0.4-2.0mm 0.3m-12m 1/4” 13.7mm 0.4-2.0mm 0.3m-12m 3/8” 17.1mm 0.4-2.0mm 0.3m-12m 1/2″ 21.3mm 0.6mm-3.0mm 0.3m-12m 3/4″ 26.9mm 0.6mm-3.0mm 0.3m-12m 1″ 33.4mm 1.0mm-3.0mm 0....


Product Detail

Product Tags

Related Video

Feedback (2)

Innovation, excellent and reliability are the core values of our firm. These principles today more than ever form the basis of our success as an internationally active mid-size corporation for Gp Coils, Erw Steel Pipe Erw, Rolled Steel Angle, In addition, we would properly guide the customers about the application techniques to adopt our products and the way to select appropriate materials.
Wholesale Hot Rolled Steel Tube Factory - ERW Steel Pipe – TOPTAC Detail:

Products Name:ERW Steel Pipes:

Standard:ASTM A53, ASTM A500,BS1387,BS EN10219,EN10217 GB/T3091-2001

Material:Q195,Q235,Q345,GRA GRB,S235JRH,S275JOH,S355JOH ETC,

Outdiameter:6mm-406.4mm(1/8”to 16”)

Sizes of  Steel pipes                        

Outer Diameter Wall Thickness Length
Inch mm mm meter
1/8” 10.3mm 0.4-2.0mm 0.3m-12m
1/4” 13.7mm 0.4-2.0mm 0.3m-12m
3/8” 17.1mm 0.4-2.0mm 0.3m-12m
1/2″ 21.3mm 0.6mm-3.0mm 0.3m-12m
3/4″ 26.9mm 0.6mm-3.0mm 0.3m-12m
1″ 33.4mm 1.0mm-3.0mm 0.3m-12m
1-1/4″ 42.3mm 1.0mm-4.0mm 0.3m-12m
1-1/2″ 48.3mm 1.0mm-4.0mm 0.3m-12m
2″ 60.3mm 1.5mm-4.0mm 0.3m-12m
2-1/2″ 76.1mm 1.5mm-4.0mm 0.3m-12m
3″ 88.9mm 1.5mm-9.5mm 0.3m-12m
4″ 114.3mm 2.0mm-9.5mm 0.3m-12m
5″ 141.3mm 3.0mm-9.5mm 0.3m-12m
6″ 168.3mm 3.0mm-12.0mm 1.0m-12m
8″ 219.1mm 3.2mm-12.0mm 1.0m-12m
10″ 273mm 3.2mm-12.0mm 1.0m-12m
12″ 323.8mm 6.0mm-15.0mm 1.0m-12m
14″ 355.6mm 8.0mm-15.0mm 1.0m-12m
16″ 406.4mm 8.0mm-20.0mm 1.0m-12m

Ends:Beveled ends,plain ends,threaded

Surface:mill finish,galvanized,painted,powder coated

Package: Packing by plastic bags,bundled by steel strip,or as your demand

Delivery Time: 1.The products in stock will delivery immediately received the deposit

2.According to the order quantity, the delivery time range from five days to twenty  days.

Trade Terms:

1.Price Term:EX-Work,FOB,CFR,CIF,

2.Payment Term:T/T or L/C

<!–

Download as PDF

–>


Product detail pictures:

Wholesale Hot Rolled Steel Tube Factory - ERW Steel Pipe – TOPTAC detail pictures

Wholesale Hot Rolled Steel Tube Factory - ERW Steel Pipe – TOPTAC detail pictures

Wholesale Hot Rolled Steel Tube Factory - ERW Steel Pipe – TOPTAC detail pictures

Wholesale Hot Rolled Steel Tube Factory - ERW Steel Pipe – TOPTAC detail pictures

Wholesale Hot Rolled Steel Tube Factory - ERW Steel Pipe – TOPTAC detail pictures


Related Product Guide:
Cooperation

Our enterprise since its inception, usually regards product top quality as business life, repeatedly enhance manufacturing technology, make improvements to product excellent and continuously strengthen enterprise total high quality administration, in strict accordance with all the national standard ISO 9001:2000 for Wholesale Hot Rolled Steel Tube Factory - ERW Steel Pipe – TOPTAC , The product will supply to all over the world, such as: Manchester, Australia, France, Since the establishment of our company, we've realized the importance of providing good quality goods and the best before-sales and after-sales services. Most problems between global suppliers and clients are due to poor communication. Culturally, suppliers can be reluctant to question points they do not understand. We break down these barriers to ensure you get what you want to the level you expect, when you want it.
  • The company has rich resources, advanced machinery, experienced workers and excellent services, hope you keep improving and perfecting your products and service, wish you better!
    5 Stars By Pag from Serbia - 2017.03.28 12:22
    This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Roberta from Guinea - 2017.08.18 18:38
    Write your message here and send it to us