Wholesale Stainless Stove Pipe Factory - Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube – TOPTAC

Short Description:

Product name  Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube Out diameter 5*5-150*150mm Wall Thickness 0.3-3.0mm Length 0.3m-12m or as per customers’ requirement Pipe end 1.Plain end2.no burr Surface Galvanized with zinc 40-300g/m2 Standard ASTM A500, BS EN10219,EN10210  GB/T3094,GB6728,JIS G3466-2010 Material Q195,Q235,Q345,GRA GRB,S235JRH,S275JOH,S355JOH,STKR400,SS400 ETC, Main Market Middle east, Africa, North and South America, East and West Europe, South and Sout...


Product Detail

Product Tags

Related Video

Feedback (2)

We've numerous great employees customers excellent at promoting, QC, and working with kinds of troublesome difficulty inside the generation method for Galvanized Rectangular Steel Tube, Metal Box Section Sizes, Black Galvanized Pipe, Our main objectives are to deliver our consumers worldwide with high quality, competitive selling price, satisfied delivery and outstanding providers.
Wholesale Stainless Stove Pipe Factory - Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube – TOPTAC Detail:

Product name  Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube
Out diameter 5*5-150*150mm
Wall Thickness 0.3-3.0mm
Length 0.3m-12m or as per customers’ requirement
Pipe end 1.Plain end2.no burr
Surface Galvanized with zinc 40-300g/m2
Standard ASTM A500, BS EN10219,EN10210  GB/T3094,GB6728,JIS G3466-2010
Material Q195,Q235,Q345,GRA GRB,S235JRH,S275JOH,S355JOH,STKR400,SS400 ETC,
Main Market Middle east, Africa, North and South America, East and West Europe, South and Southeast Asia

Package of Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube: Packing by plastic bags,bundled by steel strip,or as your demand

Delivery Time: 1.The products in stock will delivery immediately received the deposit

2.According to the order quantity, the delivery time range from five days to twenty  days.

Trade Terms:

1.Price Term:EX-Work,FOB,CFR,CIF,

2.Payment Term:T/T or L/C

 Application: Steel Structure,Building etc.

 

 

 

<!–

Download as PDF

–>


Product detail pictures:

Wholesale Stainless Stove Pipe Factory - Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube – TOPTAC detail pictures

Wholesale Stainless Stove Pipe Factory - Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube – TOPTAC detail pictures

Wholesale Stainless Stove Pipe Factory - Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube – TOPTAC detail pictures

Wholesale Stainless Stove Pipe Factory - Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube – TOPTAC detail pictures

Wholesale Stainless Stove Pipe Factory - Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube – TOPTAC detail pictures

Wholesale Stainless Stove Pipe Factory - Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube – TOPTAC detail pictures


Related Product Guide:
Cooperation

We are committed to providing easy,time-saving and money-saving one-stop purchasing service of consumer for Wholesale Stainless Stove Pipe Factory - Tianjin ERW Pre Galvanized GI Square Steel Pipe Tube – TOPTAC , The product will supply to all over the world, such as: Sydney, Azerbaijan, Liberia, Our company, is always regarding quality as company' s foundation, seeking for development via high degree of credibility , abiding by iso9000 quality management standard strictly , creating top-ranking company by spirit of progress-marking honesty and optimism.
  • We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Erin from Kyrgyzstan - 2017.07.28 15:46
    We are really happy to find such a manufacturer that ensuring product quality at the same time the price is very cheap.
    5 Stars By Edith from Austria - 2017.09.16 13:44
    Write your message here and send it to us