ZJ114 Cigarette making combination speed 5000cig/min

Short Description:

ZJ114 (Mark 9) cigarette making line is mainly composed of four single machines:  1. YJ114 (MK9) CIGARETTE MAKER 2. YJ214 (MAX-S) PLUG ASSEMBLER 3. YJ35D (HCF80) TRAY FILLER 4. The tools and spare parts for installation with the combination Specification: 1.Total power:  40KVA 2.Outside dimension: Maker: 3630 × 1270 × 1870; Plug assembler: 3340 × 1340 × 1820; Tray filler: 2350 × 2400 × 2100 3. Weight: 10000kgs, packed in  4 cases,   Shipment in 1x40hq/set Technical Overview: 1.  AC servo dr...


  • FOB Price: US $0.5 - 9,999 / Piece
  • Min.Order Quantity: 100 Piece/Pieces
  • Supply Ability: 10000 Piece/Pieces per Month
  • Product Detail

    Product Tags

    ZJ114 (Mark 9) cigarette making line is mainly composed of four single machines: 

    1. YJ114 (MK9) CIGARETTE MAKER

    2. YJ214 (MAX-S) PLUG ASSEMBLER

    3. YJ35D (HCF80) TRAY FILLER

    4. The tools and spare parts for installation with the combination

    Specification:

    1.Total power:  40KVA

    2.Outside dimension: Maker: 3630 × 1270 × 1870;

    Plug assembler: 3340 × 1340 × 1820;

    Tray filler: 2350 × 2400 × 2100

    3. Weight: 10000kgs, packed in  4 cases,   Shipment in 1x40hq/set

    Technical Overview:

    1.  AC servo driving system is adopted to improve the driving system.

    2.. The control center adopts the PLC of SIEMENS S7-300 SERIES. It relies on PROFIBUS-DP to transmit the signals between the main PLC and valve terminal and AC servo motor.

    3.  SIEMENS touch screen provides friendly man-machine interface.

    4.  Photoelectric empty-tip inspector is used to automatically inspect and reject the   empty-tip cigarettes.

    5.  The Microwave Weight Control system is adopted.

    6.  It utilizes centralized and integrated electromagnetic valve terminal.

    7.  speed 3500-5000cig/min

    The Quality Commitment:

    The equipment will run well within 12 months in the condition of correct installation, normal operation and maintenance from the acceptance date. If the key part is found damaged due to the manufacturing quality, our company will agree to change the part free of charge.

     


  • Previous:
  • Next:

  • Write your message here and send it to us